Home » Case Studies » PCFC National Day
PCFC’s National Day is not a trade-show stand — it’s a full civic ceremony staged inside a working port and customs precinct, run to state protocol in front of Dubai Customs’ own chairman, Director General and government partners: military marching band, national anthem, an oath of allegiance, a commemorative film, sponsor recognition, and prize-giving.
MENRAS built the 47th edition (2 December 2018) inside a converted Heritage Area warehouse, and was brought back the following year to build the 48th (2 December 2019) inside a different structure entirely — Shed 4 at Marina Cube, Mina Rashid. Dubai Customs’ own events team described MENRAS directly to an outside falconry supplier as “our contractor for the event.”
Our role
Structural Build & Fabrication
Rigging & AV Production
Power & Generation
Flags & Signage
Heritage Styling
Approvals & Liaison
Client
PCFC, through Dubai Customs
Events
UAE National Day 47 (2018) and 48 (2019)
2018 venue
Heritage Area warehouse, Dubai
2019 venue
Shed 4, Marina Cube, Mina Rashid
No single theme line runs through both years — what repeats is the answer to the brief itself: treat a working port shed as sovereign ceremony ground, built to the same structural discipline as anything else on the site.
In 2018 that meant staging the Heritage Area as a real majlis — Sadu-pattern textiles, mashrabiya furniture, ground seating and Moroccan lanterns turning a warehouse into reception, arch entrance, grandstand and stage — anchored by 120 flags and three giant Sheikh-portrait banners flown above the Barasti tents. In 2019, the same instinct carried into a new venue: Shed 4 taken from empty structure to certified, ceremony-ready ground, with falconry brought in as the year’s cultural note.






2 editions
National Day delivered in successive years
~2,800 sqm
Main hall plus four further zones mapped on the 2018 build
44 hoists
Carrying a calculated 11,568kg flying load across 200m+ of truss
2 x 410kVA
Synchronised generators plus a 60kVA standby unit
120 flags
Plus 3 giant Sheikh-portrait banners







In 2018, the full ceremony build was completed and handed over inside the agreed window — build-up ran from 18 to 29 November — with the venue returned to Ports & Operations, carpeted, as committed. In 2019, the Shed 4 structure passed structural review and completion certification ahead of the event, and the ceremony ran to the client’s own finalised agenda. Across both years, Dubai Customs’ events team named MENRAS directly as its contractor to outside suppliers coordinating on the day.
For a government client whose “stand” is a sovereign ceremony staged inside a live operational port — where the build has to satisfy civil defence, port operations and state protocol all at once — MENRAS is the contractor asked back two years running, with the drawings, load calculations and structural certificates to show every rig, generator and structure was signed off before a single guest arrived.